UPVC windows fitting Method Statement

This method statement for fitting upvc windows is available as an instant download.
At the top of the first page, you can enter your company name and project details, and at the bottom, you can sign, print, and date it.
It couldn’t be easier. Once you’ve entered your details, you’re good to go.
Upvc windows are made from frames and sills designed specifically for double glazing, utilising a material known as unplasticised polyvinyl chloride (UPVC). This type of plastic is engineered to be hard and rigid, distinguishing it from more flexible plastics used in products like food wraps.
Upvc is often chosen for window frames due to its notable strength and durability. This material is weather-resistant, capable of withstanding various environmental conditions without significant wear or damage. Additionally, upvc requires minimal maintenance, making it appealing to homeowners and builders.
The production of upvc excludes the use of plasticisers—agents that would typically soften the plastic. As a result, upvc maintains its rigidity and structural integrity under different conditions.
This material is suitable for window applications because it resists corrosion, moisture, and thermal fluctuations, which can affect other materials over time. Moreover, upvc windows are often more cost-effective than alternative framing materials, making them a practical option for residential and commercial projects.
Upvc windows are recognised for their energy efficiency properties, contributing to reduced heating and cooling costs in buildings. Their durability ensures a long lifespan, while their low-maintenance nature allows homeowners to benefit without requiring frequent repairs or replacements.
The manufacturing method for upvc commonly involves injection moulding, where powdered upvc is injected into a mould to form the desired frame shapes. Once formed, these frames can be cut and finished to meet specific aesthetic and functional requirements, demonstrating their adaptability in modern architecture.
You can customise the document to your company and needs by inserting your company name, logo, contract details, site address, etc…
The method statement becomes part of your branded H&S package.
The method statement is:
- Recognised by local authorities
- Recognised by principal contractors
- Suitable for CDM sites
- Approved by H&S managers
It increases your chance of winning tenders and has been written by trained health and safety professionals.
If the method statement needs altering to include an additional task, such as:
“Ensure you sign and date the site register located in the welfare facilities before commencing work”
It can easily be added as the document comes in Word™, not PDF.
Once you buy and download this document, it’s yours for life to use repeatedly.
We’ve done the hard work for you, allowing you to give people confidence in you, your company, your products and services.
The scope of work that this method statement covers includes:
- Start of works
- Remove existing windows
- Fitting new windows
- Finishing
Why not browse the HSEDocs catalogue of method statements, risk assessments, COSHH assessments, or industry-specific packages?
And for safety training relevant to your job, visit our online training courses.
GET THIS DOCUMENT
£8.99+VAT
- Available in Word™
- Fully customisable
- Add your Company Logo
- UK & EU Compliant