Connect to gas main method statement

Gas fitter pressure testing suply

This method statement for connecting or altering a gas main is available as an instant download.

At the top of the first page, you can enter your company name and project details, and at the bottom, you can sign, print, and date it.

It couldn’t be easier. Once you’ve entered your details, you’re good to go.

You can customise the document to your company and needs by inserting your company name, logo, contract details, site address, etc…

The method statement becomes part of your branded H&S package.

The method statement is:

  • Recognised by local authorities
  • Recognised by principal contractors
  • Suitable for CDM sites
  • Approved by H&S managers

It increases your chance of winning tenders and has been written by trained health and safety professionals.

If the method statement needs altering to include an additional task, such as:

          “Ensure you sign and date the site register located in the welfare facilities before commencing work”

It can easily be added as the document comes in Word™, not PDF.


Once you buy and download this document, it’s yours for life to use repeatedly.

Some sample text from this document reads:

  1. Prior to works commencing, a drop test and a function test of all relevant gas appliances should be carried out.
  2. Rectify any leaks or repairs as necessary and confirm safe installation by carrying out a successful drop test.
  3. Only work on gas main if it has passed a visual inspection for defects and soundness and that it conforms to current regs.
  4. Isolate and blank off the main section to be worked upon at source, and before alteration or connection, a purge must be carried out. 

Why not browse the HSEDocs catalogue of method statements, risk assessments, COSHH assessments, or industry-specific packages?
And for safety training relevant to your job, visit our online training courses. 

GET THIS DOCUMENT

£8.99+VAT

  • Available in Word™
  • Fully customisable
  • Add your Company Logo
  • UK & EU Compliant
Customers reviews and ratings