Jack Hammer Risk Assessment

Makita jack hammer

A comprehensive pre-filled risk assessment for using a Jack Hammer.

This document is:

  • Recognised by local authorities
  • Recognised by principal contractors
  • Suitable for CDM sites
  • Approved by H&S managers

It increases your chance of winning tenders and has been written by trained health and safety professionals.

If you want others to have confidence in your company, download and buy the proper documents today.

As with all our documents, our risk assessments are in Word™ format and available for instant download and use. You only need to buy them once.

Once you buy and download this document, it's yours for life to use over and over again.

Download today's risk assessment, put your company details on, and use it immediately.

Give people confidence in you, your company, your products and services.

 

Some sample text from this document reads:

'Hand-arm vibration'

• Exposure to vibration can lead to the development of "vibration white finger" (VWF)"

• No tools to be used where exposure levels are at or above the ELV (Exposure Limit Value of 400 points or five ms²)

• A minimum of palm-coated gripper gloves to be worn (EN 388) and work exposure levels in line with a tool to be followed

• Minimise the length of time vibratory tools and equipment are used in one go by dividing workloads into ten-minute slots

• All operatives are to be given hand-arm vibration toolbox talk on induction

• Consideration is given to minimising vibration levels when selecting new equipment.

GET THIS DOCUMENT

£8.99+VAT

  • Available in Word™
  • Fully customisable
  • Add your Company Logo
  • UK & EU Compliant

What Our Customers Think