Breaking out concrete Risk Assessment

Construction worker using breaker

A comprehensive Risk Assessment for breaking out concrete.

This document is:

  • Recognised by local authorities
  • Recognised by principal contractors
  • Suitable for CDM sites
  • Approved by H&S managers

It increases your chance of winning tenders and has been written by trained health and safety professionals.

If you want others to have confidence in your company, download and buy the proper documents today.

As with all our documents, our risk assessments are in Word™ format, available for instant download and use, and only need to be bought once.

Once you buy and download this document, it’s yours to keep and use for life.

Download it today, put your company details on it, and use it immediately.

Give people confidence in you, your company, your products and services.

 

Some sample text from this document reads:

'Slips, trips and falls'

• Operatives or the public could suffer sprains, fractures, and tissue damage from slipping, tripping, or falling over tools, materials, waste, or areas of bad ground.

• Good housekeeping maintained at all times

• Waste materials to be bagged or skipped as work progresses

• Work area to be cordoned off where possible and use of site signage

Supervisor to brief operatives on safe working practices, housekeeping and the danger on site of slips, trips and falls before works commencing

GET THIS DOCUMENT

£8.99+VAT

  • Available in Word™
  • Fully customisable
  • Add your Company Logo
  • UK & EU Compliant

What Our Customers Think