Renew concrete floor Method Statement

This method statement for laying a concrete floor is available as an instant download and has a section at the top of the first page for you to enter your company name and project details, and a section at the bottom for you sign, print and date.

It couldn’t be easier. Once you’ve entered your details, you’re good to go.

You make the document specific to you and your needs by inserting your company name, logo, contract details, site address etc…

The method statement becomes part of your branded H&S package.

The method statement is:

  • Recognised by local authorities
  • Recognised by principal contractors
  • Suitable for CDM sites
  • Approved by H&S managers

It increases your chance of winning tenders and has been written by trained health and safety professionals.

If the method statement needs altering to include an additional task, such as:

          “Ensure you sign and date the site register located in the welfare facilities prior to commencing work”

It can easily be added as the document comes in Word™ format and not PDF.


Once you buy and download this document, it’s yours for life to use over and over again.

We’ve done the hard work for you allowing you to give people confidence in you, your company, your products and services.

The scope of works that this method statement covers include:

  1. Start of works
  2. Renew floor
  3. Finishing 

GET THIS DOCUMENT

£8.99+VAT

  • Available in Word™ & PDF
  • Fully customisable
  • Add your Company Logo
  • UK & EU Compliant