Ceramic wall tiles Method Statement

This Method Statement for ceramic wall tiles is in Word format for you to download. At the top of the first page, you can enter your company name and project details, and at the bottom, you can sign, print, and date it.
The advantages of this are:

  • You can add additional methods for the job in hand if they are specific to the task

  • You can delete, amend or edit any part of the document you wish

  • You can make the document specific to you and your needs by inserting your company name, logo, contact details, site address, etc.

Below is a sample section from this document:

  1. Isolate the electric supply and unscrew the front covers to plugs and sockets as required.

  2. Apply a mist coat to bare plaster walls.

  3. Check the level of the baths and worktops. If they are perfectly level, you can use this as a datum line.

  4. If you don’t have a level datum line, fit a timber ground one tile high plus the grout above the lowest point.

 

GET THIS DOCUMENT

£8.99+VAT

  • Available in Word™
  • Fully customisable
  • Add your Company Logo
  • UK & EU Compliant

What Our Customers Think