Hanging doors Method Statement

A photograph of a construction worker meticulously fitting a new lock on a wooden lounge door. The worker, a man with a weathered face and tired eyes, wears a heavily worn yellow high-visibility vest and thin gloves.

This method statement for fitting doors is available as an instant download.

At the top of the first page, you can enter your company name and project details, and at the bottom, you can sign, print, and date it.

It couldn’t be easier. Once you’ve entered your details, you’re good to go.

You can customise the document to your company and needs by inserting your company name, logo, contact details, site address, etc…

The method statement becomes part of your branded H&S package.

Timber doors are a versatile option for both residential and commercial properties, offering numerous benefits. Their aesthetic appeal allows for various finishes that complement a range of interior designs, from rustic to modern.

In terms of functionality, timber doors provide excellent thermal and sound insulation, making them ideal for bedrooms, bathrooms, and communal areas. Many options also feature fire ratings for added safety and can include glazed panels to increase natural light.

Popular designs, such as timber French doors and folding doors, facilitate seamless transitions between indoor and outdoor spaces, making them perfect for entertaining. These doors can be built with reinforced frames and secure locking mechanisms, ensuring robust security.

Known for their durability, timber doors can withstand harsh weather with proper maintenance and significantly enhance a home’s curb appeal. With a wide range of styles available, they are a stylish and practical investment for any property.

The method statement is:

  • Recognised by local authorities
  • Recognised by principal contractors
  • Suitable for CDM sites
  • Approved by H&S managers

It increases your chance of winning tenders and has been written by trained health and safety professionals.

If the method statement needs altering to include an additional task, such as:

          “Ensure you sign and date the site register located in the welfare facilities before commencing work”

It can easily be added as the document comes in Word™, not PDF.


Once you buy and download this document, it’s yours for life to use repeatedly.

We’ve done the hard work for you, allowing you to inspire confidence in your company and your products and services.

The scope of work that this method statement covers includes:

  1. Start of works
  2. Fit door
  3. Finishing 

Why not browse the HSEDocs catalogue of method statements, risk assessments, COSHH assessments, or industry-specific packages?
And for safety training relevant to your job, visit our online training courses. 

GET THIS DOCUMENT

£8.99+VAT

  • Available in Word™
  • Fully customisable
  • Add your Company Logo
  • UK & EU Compliant
Customers reviews and ratings