Paving slabs Method Statement

This Method Statement for laying paving slabs comes in Word format for you to download and has a section at the top of the first page for you to enter your company name and project details, and a section at the bottom for you sign, print and date.
The advantages of this are:

  • You can add additional methods for the job in hand if they are specific to the task

  • You can delete, amend or edit any part of the document you wish

  • You can make the document specific to you and your needs by inserting your company name, logo, contract details, site address etc..

 A sample section of the document is listed below:

Laying slabs

  1. Set up two string lines at a height of 80mm above the type 1 sub base ensuring they are taught, parallel and the same width as the slabs.

  2. Using sharp sand and cement mix a 1:6 mortar and shovel a 40mm gauge onto the sub base.

  3. Drag the corner of a shovel through the laid mix to create wave effects on the surface.

  4. Lay the slab flat and tap into place using a rubber mallet ensuring it is level and square.

 

Method statement slabs 

Single Document

 

Regular Price £8.99

Buy 10 documents. Save £39.90

Buy 20 documents. Save £90.00

Buy 30 documents. Save £149.70


Add to Basket View Basket