Ceramic wall tiles Method Statement

This Method Statement for ceramic wall tiles comes in Word format for you to download and has a section at the top of the first page for you to enter your company name and project details, and a section at the bottom for you sign, print and date.
The advantages of this are:

  • You can add additional methods for the job in hand if they are specific to the task

  • You can delete, amend or edit any part of the document you wish

  • You can make the document specific to you and your needs by inserting your company name, logo, contract details, site address etc..

Below is a sample section from this document:

  1. Isolate electric supply and unscrew front covers to plugs and sockets as required.

  2. Apply a mist coat to bare plaster walls.

  3. Check the level baths and worktops. If they are perfectly level you can use this as a datum line.

  4. If you don’t have a level datum line fit a timber ground one tile high plus the grout above the lowest point.

 

Single Document

 

Regular Price £8.99

Buy 10 documents. Save £39.90

Buy 20 documents. Save £90.00

Buy 30 documents. Save £149.70


Add to Basket View Basket