What is a method statement?

What is a method statement pic

What is a method statement?

It's best when we ask ourselves what is a method statement, to simplify the question and ask, 'What is the method? Although this is a health and safety document and its primary purpose is to help people carry out tasks safely, at its core it's just a set of instructions. It's a health and safety document detailing how elements of work or specific tasks should be carried out in a safe manner.

What should be included in a method statement?

The document should be site specific and contain various elements such as company name, document author, date created, project details, as well as a step by step guide listing a safe system for carrying out a task. On most ocassions when we buy flat packed furniture, the instructions are pictorial and can be understood in any language. Additionally, if there is a right and wrong way to do something where the wrong way may damage the product or cause injury to the person assembling the furniture, there are usually two pictures: One with a green tick and the other with a red cross. In effect this is a health and safety document or a method statement listing the order of works and how to carry out each task safely.

An example of a method statement

At the top of the page you let people know what type of health and safety document this is, followed by the specific task. In this case it is:

Method Statement – Brick and blockwork

The next lines are about who created the document and who it's for, and read:

Prepared by YOUR COMPANY NAME

For: NAME OF PROJECT/CONTRACT NUMBER 

After this you list the scope of works that the method statement will cover:

This method statement describes the work process for the following

  1. Start of works
  2. Setting out
  3. Basic workmanship
  4. Finishing

Now you can start to expand on each section of the scope of works. Letting people know what order to do things in and how to carry out each task in a safe manner:

1. Start of works

  1. Read relevant risk and COSHH assessment and follow guidelines for the correct PPE.

  2. Sheet up and protect work area and surrounding, including signage and barriers as required.

  3. Visually inspect work area and only begin works if it is a safe working environment.

  4. Cordon off work area if required to do so.

  5. Ensure the area to be worked and exit points are clear of obstruction and that safe access and egress is maintained.

  6. Check any electrical or hand tools for damage or faults, faulty or damaged tools must be removed from service immediately.

  7. Do not leave tools and equipment unattended at any time

 

After the entire work process has been described it is important to sign and date the document.

Our method statement catalogue

Our method statements are concise health and safety documents, detailing the correct way to carry a task and have been written by a competent person who is familiar with the relevant processes required to complete the task. They are references for both operatives and supervisors/management and details the activity in hand using a safe system of work, itemising how a task or process is to be carried out.

Please feel free to browse our catalogue below or use the search feature on the left to narrow your results.

If you'd prefer to look at some packaged health and safety solutions we've put together based on specific industries, you can find and view our best offers HERE.

All documents are in Word™ format and are available for instant download and use.

Method Statements Method Statement Example - How to remove a bathroom suite Read More   FREE Download
Method Statements Suspended ceiling removal method statement Read More   £8.99 Add to Basket
Method Statements Block paving Method Statement Read More   £8.99 Add to Basket
Method Statements Boarding and skimming Method Statement Read More   £8.99 Add to Basket
Method Statements Bonding and skimming Method Statement Read More   £8.99 Add to Basket
Method Statements Breaking out concrete floor Method Statement Read More   £8.99 Add to Basket
Method Statements Brick and block work Method Statement Read More   £8.99 Add to Basket
Method Statements Builders clean Method Statement Read More   £8.99 Add to Basket
Method Statements Carpet fitting method statement Read More   £8.99 Add to Basket
Method Statements Ceramic floor tiles Method Statement Read More   £8.99 Add to Basket
Method Statements Ceramic wall tiles Method Statement Read More   £8.99 Add to Basket
Method Statements Cleaning brickwork Method Statement Read More   £8.99 Add to Basket
Method Statements Connect to gas main method statement Read More   £8.99 Add to Basket
Method Statements Demolish wall and footings Method Statement Read More   £8.99 Add to Basket
Method Statements Dig out and concrete foundations and trenches Method Statement Read More   £8.99 Add to Basket
Method Statements Electrical rewire and new installations Method Statement Read More   £8.99 Add to Basket
Method Statements Electrical testing Method Statement Read More   £8.99 Add to Basket
Method Statements Fencing Method Statement Read More   £8.99 Add to Basket
Method Statements Fitting lintels Method Statement Read More   £8.99 Add to Basket
Method Statements Fitting timbers for a flat roof Method Statement Read More   £8.99 Add to Basket
Method Statements Hack off plaster to walls and ceilings Method Statement Read More   £8.99 Add to Basket
Method Statements Hanging doors Method Statement Read More   £8.99 Add to Basket
Method Statements Hanging wallpaper Method Statement Read More   £8.99 Add to Basket
Method Statements Hedge cutting, strimming and lawn mowing Method Statement Read More   £8.99 Add to Basket
Method Statements Kitchen fitting Method Statement Read More   £8.99 Add to Basket
Method Statements Laminate flooring Method Statement Read More   £8.99 Add to Basket
Method Statements Maintenance and service of central heating system method statement Read More   £8.99 Add to Basket
Method Statements Marking and fixing Method Statement Read More   £8.99 Add to Basket
Method Statements Office clean Method Statement Read More   £8.99 Add to Basket
Method Statements Painting Method Statement Read More   £8.99 Add to Basket
Method Statements Paving slabs Method Statement Read More   £8.99 Add to Basket
Method Statements Plumbing a bathroom suite Method Statement Read More   £8.99 Add to Basket
Method Statements Plumbing General Method Statement Read More   £8.99 Add to Basket
Method Statements Pointing and repointing brickwork Method Statement Read More   £8.99 Add to Basket
Method Statements Power flushing central heating method statement Read More   £8.99 Add to Basket
Method Statements Rain water goods Method Statement Read More   £8.99 Add to Basket
Method Statements Rainwater goods Method Statement Read More   £8.99 Add to Basket
Method Statements Remove pigeon guano Method Statement Read More   £8.99 Add to Basket
Method Statements Rendering Method Statement Read More   £8.99 Add to Basket
Method Statements Renew concrete floor Method Statement Read More   £8.99 Add to Basket
Method Statements Screed floor Method statement Read More   £8.99 Add to Basket
Method Statements Tar and glue removal - Method Statement Read More   £8.99 Add to Basket
Method Statements Timber partitioning Method Statement Read More   £8.99 Add to Basket
Method Statements Underground drainage Method Statement Read More   £8.99 Add to Basket
Method Statements Underpinning Method Statement Read More   £8.99 Add to Basket
Method Statements UPVC door fitting Method Statement Read More   £8.99 Add to Basket
Method Statements UPVC soffit and fascia Method Statement Read More   £8.99 Add to Basket
Method Statements UPVC windows fitting Method Statement Read More   £8.99 Add to Basket
Method Statements Glass Cleaner Jangro Read More   £8.99 Add to Basket
View Basket